TIA is an Oracle Certified Partner  

Relevant

A New Template for Joomla!

 

TIA, Inc.

Do your employees have access to the important information they need to do their jobs?

TIA, Inc. designs materials so your employees can access
the information they need in
30 Seconds or 3 Clicks.

TIA, Inc. - Information in 30 Seconds or 3 Clicks

Call TIA, Inc. - 303.321.2122

PDF Print E-mail

Manufacturing Management Documentation

Product Data Management (Discrete) Documentation for JD Edwards / Oracle

The following Product Data Management (Discrete) Documentation for JD Edwards / Oracle World is available to order. To order documentation click HERE.

Set Up Discrete Manufacturing Documents

  • Setting Up Discrete Manufacturing
  • Setting Up Manufacturing Constants
  • Setting Up Time Basis Codes
  • Setting Up Phase In Codes
  • Setting Up Standard Procedure Descriptions
  • Setting Up the Shop Floor Calendar
  • Setting Up the Make/Buy Table
  • Setting Up Existing Disposition Codes
  • Setting Up Priority Codes
  • Setting Up Reason Codes
  • Setting Up Routing Types
  • Setting Up Status Codes
  • Setting Up Revision Levels

Work With Bills of Material Documents

  • Working With Bills of Material
  • Working With Bills of Material Text
  • Working With a Parent Item Bill Of Material
  • Working With Batch Information For a Bill of Material Parent Item
  • Working with Components
  • Working With Component Locators
  • Working with a Substitute Item
  • Working With Planning Bill and Kit Information
  • Working With Production Information
  • Work with Additional Manufacturing Information
  • Working with a Percent Bill
  • Working With Grade Or Potency Information
  • Work with Reference Information
  • Locate a Multi Level Bill of Material
  • Locate Items in a Multi Level Bill of Material
  • Locate a Single Level Bill of Material
  • Locate Items in a Single Level Bill of Material
  • Copy Component Text
  • Enter Component Text
  • Enter or Change Components
  • Enter a Bill of Material Parent Item
  • Set Up Bill of Material Type

Review Bills of Material Documents

  • Reviewing Bills of Material

Work With Work Centers Documents

  • Working With Work Centers
  • Entering a Work Center
  • Enter Work Center Hours
  • Enter Work Center Details
  • Entering Costing and Accounting Information
  • Reviewing Operations by Work Center

Work With Routings Documents

  • Working With Routings
  • Entering a Routing
  • Enter Batch Routing Information
  • Enter Routing Hours
  • Enter a Parent Item Routing
  • Entering Outside Operations
  • Working With Text
  • Set Up an Approval Routing Master
  • Set Up an Order Specific Approval Routing
  • Reviewing Routing Information

Work With Leadtimes Documents

  • Working With Leadtimes
  • Reviewing Leadtimes

Engineering Change Management Documents

  • Enter Engineering Information
  • Locate Equipment Change Order Information

Set Up Engineering Change Orders Documents

  • Setting Up Engineering Change Orders
  • Setting Up Engineering Change Order Codes
  • Setting Up Next Numbers for Engineering Change Orders
  • Setting Up Approval Routings
  • Setting Up Type Codes
 

Manufacturing Management Examples

ExampleImageExampleImage