TIA is an Oracle Certified Partner  

Relevant

A New Template for Joomla!

 

TIA, Inc.

Do your employees have access to the important information they need to do their jobs?

TIA, Inc. designs materials so your employees can access
the information they need in
30 Seconds or 3 Clicks.

TIA, Inc. - Information in 30 Seconds or 3 Clicks

Call TIA, Inc. - 303.321.2122

PDF Print E-mail

Manufacturing Management Documentation

Equipment / Plant Maintenance Documentation for JD Edwards / Oracle

The following Equipment / Plant Maintenance Documentation for JD Edwards / Oracle World is available to order. To order documentation click HERE.

Create an Equipment Master Documents

  • Creating an Equipment Master

Enter Additional Detailed Information Documents

  • Entering Supplemental Information Details
  • Review Supplemental Information By Data Type
  • Review Supplemental Information By Equipment
  • Entering Specification Information
  • Entering Permit and License Information

Search for Equipment Information Documents

  • Searching for Equipment by Field
  • Searching for Equipment by Query
  • Entering an Equipment Message
  • Reviewing Equipment Messages

Review Parent and Component Information Documents

  • Reviewing Current Equipment Components

Track Equipment Location Documents

  • Entering Location Information with Inquiry
  • Entering Location Information without Inquiry
  • Reviewing Location Information
  • Revising Location Information
  • Revise the Location for a Part

Review Maintenance Costs Documents

  • Reviewing Equipment Costs by Repair Code
  • Review Equipment Costs by Cost Account
  • Reviewing Shop Costs by Cost Account
  • Reviewing Shop Costs by Repair Code

Create a PM Schedule Documents

  • Creating a PM Schedule
  • Creating an Equipment PM Schedule
  • Linking Service Types
  • Creating a Maintenance Loop
  • Creating a Model Work Order
  • Set Up a Model PM Schedule
  • Apply a Model PM Schedule To A Piece Of Equipment

Work with Meter Readings Documents

  • Setting Up Meter Estimates

Change the Status of PMs to Complete Documents

  • Changing the Status of PMs to Complete

Create Corrective Work Orders Documents

  • Creating Corrective Work Orders
  • Assigning Category Codes to a Work Order
  • Add Explanatory Text to a Part
  • Assigning Parts to a Work Order
  • Assigning Parts from a Standard Parts List
  • Working with Selected Parts From Inventory
  • Assign Selected Parts From Inventory
  • Choose a Substitute Part
  • Assigning Parts without an Inventory Master
  • Assigning Labor Routing to a Work Order
  • Creating a Work Order for Unscheduled Maintenance

Swap a Component Documents

  • Swapping a Component

Purchase Parts for a Work Order Documents

  • Purchasing Parts for a Work Order
  • Create A Purchase Request For A Part

Add Costs to Work Orders Documents

  • Issuing Parts to a Work Order
  • Issuing Parts Included on the Work Order Parts List
  • Issuing Miscellaneous Parts to a Work Order
  • Entering Employee Time on a Work Order By Employee
  • Entering Employee Time on a Work Order By Shop or Business Unit

Review Work Order Information Documents

  • Reviewing Work Order Parts Lists
  • Reviewing Work Order Transactions
  • Reviewing Project Costs
  • Reviewing Estimated and Actual Work Order Amounts

Review the Parts Plan Documents

  • Reviewing Parts by Planning Family
  • Review Parts Detail Messages
  • Reviewing Parts Availability by Time
  • Reviewing Part Supply and Demand
  • Reviewing Parent Information for Component Parts
  • Reviewing and Revising Part Cross-References

Generate a Labor Plan Documents

  • Generating a Labor Plan

Set Up Equipment Documents

  • Setting Up Equipment Constants
  • Setting Up Equipment Next Numbers
  • Setting Up Depreciation Default Coding
  • Mapping Equipment Category Codes

Set Up User Defined Codes Documents

  • Setting Up User Defined Codes

Set Up Work Orders Documents

  • Setting Up Work Orders
  • Setting Up Work Order Next Numbers
  • Revising Processing Options for Parts Lists and Labor Routings
  • Manually Assign Labor Routing Instructions
  • Copy Labor Routing Information From Standard Instructions
  • Setting Up a Standard Parts List
  • Add Non-Stock Parts to a Parts List
  • Setting Up Standard Work Order Instructions
  • Setting Up Supply and Demand Inclusion Rules

Set Up Maintenance Planning Documents

  • Setting Up Planning Constants
  • Setting Up the Workday Calendar
  • Setting Up Work Centers
 

Manufacturing Management Examples

ExampleImageExampleImage